Installation Guide

Optional: HA.3208 Header Wedge Stabilizer
Page 8
Threshold wall
Measure and cut Soft Sill to this dimension
Soft Sill
Illustration #14
STEP 14 - SILICONE
a. Run a continuous bead of silicone along the bottom outside
and inside of the Soft Sill crossing the Center Guide.
b. Allow silicone to cure for 24 hours before using the shower.
Apply a Single Bead along inside and
outside of Soft Sill and Center Guide
STEP 13 - INSTALL SOFT SILL
a. Measure the distance between the wall and the nearest side
of the Center Guide, see Illustration 13.
b. Cut Soft Sill to this dimension.
c. Repeat for the other side of the Center Guide.
NOTE: Clean adhesion surface with alcohol and dry thoroughly.
d. Peel the backing off the tape on the Soft Sill and stick in
place on the threshold. The outer edge of the Soft Sill should
line up with the outer face of the Center Guide.
e. Repeat for second piece of Soft Sill.
Illustration #13
Installation Instructions
All Models
The Header Wedge Stabilizer consists of a Base and a Wedge. It is an optional accessory that can be used:
l
If the ends of the header bar rails are bowed inwards and are loose against the sides of the header block.
l
To help reduce roller noise and potential distortion of the header bar.
Base
Wedge
STEP 1: Insert Base between the
rails of the Header Bar.
STEP 2: Push the Wedge into the
Base until it forces to the rails of the
Header Bar against the sides of the
header block.
STEP 3: Insert the Header
Bracing plate into the slot of the
Header Block and tighten the set
screws