Installation Guide

Solutions to
Shape the World
Installation Instructions
HoldRite
®
HydroFlame
Putty Pad
WALL INSTALLATION
1
4
Remove releasing lm from the putty
pad.
Smooth surface and corners to form
the shape of the electrical box. Make
sure to have the proper overlap on
adjoining stud and drywall surfaces.
2
Align pad to the side of the electrical
box partially overlapping the stud and
adhere.
3
Work pad to opposite side of the
electrical box working it into the
edges.

Summary of content (1 pages)