Installation Guide

TESTRITE® Safety & Usage Instructions**
(800) 321-0316 www.holdrite.com HOLDRITE® 2016 92-001872-000 (Rev C)
Install Clean Out Tee, per
best practice; for PVC &ABS
with cement (do not get glue
where test device O-ring
must seal) or for No-Hub Cast
Iron with no-hub couplings
(2).
Remove Spanner Ring and
Clean Out Plug.
Insert Test Wedge into Clean Out Tee, with
“pressure side” up. (Prior to installation, be
sure all contact surfaces are clean and free of
excess glue, etc.)
Hand tighten fill/drain stem into Test Wedge clockwise until
snug.
TEST READY
**WARNING: Avoid potential damage or injury close spanner ring securely and DO NOT open while under pressure.
STEP 2
STEP 3
STEP 4
STEP 5
STEP 6a**
STEP 6b**
STEP 7**
STEP 8a**
STEP 8b**
STEP 9**
STEP 10
Confirm that hose is not attached to water source. Rotate
spigot ball valve to open position (See Fig D.) Completely
drain water out.
After water is drained, remove
Spanner Ring. Remove Test
Wedge (with proper care and
handling Test Wedge can be re-
used many times).
Re-install Clean Out Plug and Spanner Ring into Clean
Out Tee. Tighten completely (utilize spanner wrench).
TEST COMPLETE.
To release water down pipe stack, rotate valve stem to the
left (counterclockwise) several full rotations (See Fig C.).
If using Test Wedge with valve stem, turn spigot ball valve to the “closed” position (See Fig A).
Fill pipe stack (maximum 50 head/22PSI).
Re-install Spanner Ring onto Clean Out Tee.
Tighten completely (utilize spanner wrench).
Make sure ball valve is in open position (See Fig B). Fill pipe
stack (maximum 50/22PSI). Then close spigot ball valve.
IF FILLING SYSTEM WITH WATER FROM ABOVE
FILL/DRAIN THROUGH VALVE STEM
METHOD (For Test Wedge with integral
rotary valve only)
RELEASE WATER DOWN
STACK
RELEASE WATER THROUGH VALVE
STEM WITH HOSE ATTACHED (For
Test Wedge with integral rotary
valve only)
Fig. A
CLOSED
OPEN
OPEN
Fig. D
Fig. B

Summary of content (2 pages)