Use and Care Guide

6
Test complete!
***WARNING: Avoid potential damage or injury - close Spanner Ring securely and DO NOT open while under pressure.
** Air Testing - Always comply with piping manufacturers’ guidelines.
Testing non-metallic pipe systems or components with compressed air or gas can result in explosive failure, property damage, severe injury or death.
Consult the guidelines of piping manufacturers prior to the use of pressurized air.**
Turn the stem to the closed
position, turning clockwise until
tight. Perform test.***
3
Open stem by turning counter-
clockwise. Drain system
completely. Remove
Test Wedge.***
4
Remove the Cleanout Plug.
1
Insert Test Wedge and reinstall
Spanner Ring, with the pressure
arrow pointing up.
2
Reinstall Cleanout Plug.
5
TESTRITE
®
System Installation (base version without 3/4” threads or valve)
CONVERTING MAKESHIFT METHODS INTO ENGINEERED SOLUTIONS
SM