User Guide

Quick Start Guide
4 Wire Settings
After connecting the two systems with the network cable, configure each HUB Base’s line sequence by
entering "4 Wire Settings" and selecting "Line sequence switching".
Set the first HUB Base to “Standard mode” and the second HUB Base to “Cross mode”.
Ente r 4 Wire menu, and se lect
Lin e sequence switchin g
Set to  Standard mode
HUB❶
4 Wire
Sett ings
HUB
Ente r 4 Wire menu, and se lect
Lin e sequence switchin g
Set to  Cros s mode
4 Wire
Sett ings
10
Two Systems Cascade via IP Network
Use a standard network cable to connect the two systems through the RJ45 network port. Either one of the
two RJ45 network ports on the HUB works.The network cable is generally up to 300 meters long.
300m network cable
HUB Display Interfaces