Instructions / Assembly

Home Fashion PVC Composite Split Barn Door Installation Guide
Lay the box flat on the floor and open carefully. Locate the box of hardware at the bottom of the
door and the horizontal rail along one side of the door.
Parts list:
1 - Horizontal Rail 4 - Roller Brackets
5 - Horizontal Rail Spacers 8 - Roller Bracket Bolts (1.3 bolts)
5 - Horizontal Rail Bolts (4 bolts) 2 - Door Stoppers
2 Door Handles 2 - Floor Guides (1 screws)
4 Door Handle Screws (3/4 screws) 2 - Base Molding Guides (optional)
Four First Prep Steps:
1. Please read all instructions carefully before beginning installation.
2. Verify Parts
Before beginning installation, verify you have all the parts. Do not return door to store for any
missing parts. Please call 281.955.5837 or email info@homefashiontech.com for assistance.
3. Gather Tools
Drill, drill bits, tape measure, pencil, Phillips #2 screwdriver, 4’ level, step ladder, stud finder,
adjustable wrench or 10mm and 19mm sockets, paint or stain for optional 1x6 header board.
4. Locate Wall Studs
Once studs are located and marked, verify that the holes in the horizontal rail will align with the
studs, if not then you will need to purchase a 1x6 to use as a header board. Length of header
board should be 68” for 36” wide split barn door and 80” for 42” wide split barn door. Header
board must be installed into the studs using screws at least 2 long.
Six Simple Install Steps:
Install horizontal rail
Install roller brackets
Install door handles
Hang the door
Install door stops
Install guides.
Step 1. Install the horizontal rail:
Check the floor to be sure it’s level, if not level then take that into consideration when measuring
for the horizontal rail placement. Your measurement should be based on the higher floor area.
From the center of the door opening, measure up 86”. This measurement is for the center of
the center hole of the horizontal rail. With your level, make sure the horizontal rail is level. Mark
screw holes with pencil. The elongated holes in the track will allow for small adjustments to
ensure the horizontal rail is level.
Important: The horizontal rail must be installed directly into studs or installed onto a 1x6
header board which has been installed into studs.
Lag screws to mount the 1x6 are not included, we recommend using 8 lag screws at least 2
long, 4 across the top of the header board and 4 across the bottom but not across the
middle of the header board so as not to interfere with horizontal rail bolts.
Predrill the holes for the horizontal rail with drill bit. Verify the five holes are level left to right.