Instructions / Assembly

Preparation:
1. Read all instructions carefully before you begin installation.
We strongly suggest you watch the installation video at www.homefashiontech.com
.
2. Verify Parts
If any parts are missing, do not return the doors. Instead, call (281) 955-5837 or
(866) 658-7530 or email info@homefashiontech.com. We will send the part(s) to you.
.3. Gather Tools
Electric drill, drill bits (3/32" and 3/16"), tape measure, pencil, #2 Phillips screwdriver,
4' level, step ladder, stud finder, adjustable wrench or 10mm and 19mm sockets.
Installation:
1. Measure the width of the door opening. Find the center of the opening and place a
mark 86-1/8" above the floor. This is going to be for the center hole of the horizontal rail.
2. Mark the five holes. The horizontal rail has five holes for bolts. Have an assistant help
hold the horizontal rail so the center hole is over the center mark you made at 86-1/8"
above the floor. Level the rail with the 4' level. Mark the four remaining holes. Drill pilot
holes with the 3/16" drill bit. The three center holes must be in studs. If they are not, you
will need to add extra support with a Header Board (see step 3). If the two holes nearest
each end of the rail are not in studs, use the dry wall anchors (included).
3. If you need a Header Board, purchase a 1x4" board of hard wood species. A wider 1X6"
board may be used if desired (remember the holes for the horizontal rail must be 86-1/8"
from the floor). The length of the header should be the length of the horizontal rail, or
slightly longer. Prepare the board by staining or painting, if desired. Use 10 screws at
least 2-1/2" long (not included). Avoid placing the screws along the center of the header.
Header screws should be across the top and bottom of header (2 per stud). The horizontal
rail will be mounted along the center. Please review the Header Board installation video
at homefashiontech.com. Place marks on the board that match the holes in the horizontal
rail. Have an assistant help hold the horizontal rail so the center hole is over the center
mark you made at 86-1/8" above the floor. Level the rail with the 4' level. Mark the four
remaining holes and pre-drill holes.
4. Find the hole you made at the center of the opening that is 86-1/8" above the floor. With
help from your assistant, pick up the horizontal rail and place one of the 4" lag bolts
through the center hole. Place a spacer on the bolt so that the spacer will be between the
rail and the wall. The large end of the spacer goes next to the wall. Insert the bolt into the
hole you drilled. Tighten it until it is just snug. Use your 4' level to level the rail. Insert the
second 4" bolt through the hole in the rail that is just to the left of the center hole. Apply
the spacer. Tighten until snug and check the level. Repeat for the hole on the right of the
center, then for the far left and for the far right. Each time check to level the metal rail.
Tighten the lag bolts.
5. Lay the doors on the floor. Each door has four red dots that mark where the handles are
to be attached. Lay the doors with these dots facing up. Drill a very shallow pilot hole in
each red dot with the 3/32" drill. Use the ¾" screws and the #2 Phillips screwdriver to
attach the handles. Handles cannot be placed anywhere other than where the red dots
are located.
6. Attach the rollers. Each door comes with brackets for the rollers already installed. Place
the roller bracket over the pre-installed brackets, make certain they are straight, and use
the 19 mm socket or an adjustable wrench to tighten the roller bracket bolts.
7. Hang the doors. Pick up the left door and slide the rollers onto the horizontal rail from the
left side. Slide a door stopper on the left end of the horizontal rail. Position the stopper so
that the door just touches the stopper when the door is fully open and tighten. Repeat for
the right door.
8. Attach the floor guides. Each door has a groove on the bottom edge that slides over a
guide to keep the door in good alignment. Decide if the floor guide or the wall guide is best
for your needs. Place a guide about 1/2" outside the edge of the door opening (door
jamb). Slide the door over the guide and position the guide so that the door is hanging
straight up and down (hanging vertically plumb). Screw the guide to the floor or the wall
using the 1" screws. Repeat for the other door.
9. Install the center door stop. Loosen the center lag bolt just a bit. Slide the center door
stop over the lag bolt so that it fits snugly on the horizontal rail. Tighten the lag bolt.
10. You're finished! If you need assistance, call us at (281) 955-5637 or (866) 658-7530 or
email info@homefashiontech.com.
Home Fashion Technologies
PVC Composite Split Barn Door Installation Guide
Parts list:
1 Horizontal Rail
2 Door Handles
1 Center Door Stop
4 Roller Brackets
2 End Door Stops
2 Base Moulding Guides
4 Screws (1")
2 Floor Guides
4 Floor Guide Anchors
(for cement or tile floor)
8 Roller Bracket
Bolts (1.3" bolts)
8 Door Handle
Screws (3/4")
5 Horizontal Rail Spacers
5 Horizontal Rail Bolts (4" lag bolts)

Summary of content (2 pages)