Installation Guide

Table Of Contents
ii
Clearance Holes and Notching
.....................................26
Concealed Locations for Fittings ...................................28
Outdoor Installation...............................................28
4.4 Protection.............................................................29
Striker Plates ......................................................29
Through-Wall Penetration .........................................30
4.5 Meter connections.....................................................30
Connection by Special Termination Fitting .........................31
Direct Connection.................................................31
4.6 Appliance connections.................................................31
Termination Fittings with Appliance Connectors....................31
Direct Connection.................................................32
Pad-Mounted Equipment..........................................32
Roof Top Equipment...............................................32
Outdoor Appliances: Barbecue Grills, Gaslights, and Heaters . . . . . . . . 33
Fireplace Installations .............................................33
4.7 Manifold Stations......................................................34
4.8 Pressure Regulators....................................................35
Installation Requirements .........................................35
Vent Limiters and Vent Lines .......................................36
Performance Testing...............................................36
Regulator Adjustments ............................................36
4.9 Underground Installations .............................................36
4.10 Electrical Bonding ....................................................37
Chapter 5: Inspection, Repair, and Replacement of CSST
5.1 Minimum Inspection Requirements Checklist ...........................39
5.2 Repair of Damaged Tubing .............................................40
When Pipe Needs to be Replaced ..................................40
Method Of Repair: Splice or Replace?
..............................40
Chapter 6: Pressure Test Procedures
6.1 Procedure For Low Pressure Systems ...................................41
6.2 Procedure For Elevated Pressure Systems ...............................41
6.3 Appliance Connection Check Procedure ................................42
Chapter 7: Sizing/Capacity Tables
7.1 Natural Gas Sizing Tables...............................................43
6-7 in / 0.5 in w.c. drop.............................................44
6-7 in / 1 in w.c. drop ..............................................44
8-10 in / 3 in w.c. drop .............................................45
12-14 in / 6 in w.c. drop ............................................45
2 PSI / 1 PSI drop ..................................................46
5 PSI / 3.5 PSI drop.................................................46
7.2 Liquid Petroleum (LP) Sizing Tables .....................................47
11 in / 0.5 in w.c. drop .............................................47
13-14 in / 2.5 in w.c. drop ..........................................47
2 PSI / 1 PSI drop ..................................................48
5 PSI / 3.5 PSI drop.................................................48