2' Octagon Cedar Gazebo Assembly Instructions © Suncat Corporation Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.HomePlaceStructures.
Cedar Gazebo Assembly Instructions revised 06/20/09 Please read through the entire manual before starting! Note: It is very important that you have a firm, level site for the structure.
This assembly manual is to be used to assemble a HomePlace Structures 10’ or 12’ octagon cedar or vinyl gazebo. The 10’ vinyl model was used to create this floor. Depending on unit that was purchased, some of the pictures shown will differ from your unit. Gazebo without floor Gazebo with floor Gazebo floor only Step 1: Gazebo kit should arrive as shown, depending on which unit was purchased. Place kit as close to site as possible. If your unit does not include a floor, please proceed to page 11.
Step 6: Locate the double floor joists with notch cut at one end. Step 7: Use the mark from step 5 and lay out double floor joists making sure to keep notched end up and towards center as shown. Step 8: Lay out the eight perimeter band boards as shown. Step 9: Align the edge of the band board with center of the double joist and attach each end using two 3” screws in the pre-drilled holes. Note: It is important that the top edges of the band board and joist are aligned flush.
Step 10: Align corner of adjacent band board and attach using 3” screws in pre-drilled holes. Step 11: Repeat steps 9 & 10 until all band boards are installed. Step 12: Insert center connecting plates as shown. Note: If opening is tight, step on connecting plates to push them down.
Step 13: Center double joist along edge of connecting plate and attach using 3” screws. Note: There may be some space between joist and connecting plate, but it should not exceed 1/4”. Step 14: Repeat step 13 for each of the remaining double joists trying to keep an equal space between the joist and connecting plate for each board. Floor is now ready for installation of middle joists. Incorrect angle alignment Step 15: Locate the 16 middle floor joists. 16: Place one middle joist in each floor section.
Step 17: Arrange middle floor joists to match pattern shown in picture. Step 18: Align joist with pre-drilled holes in band board. Step 19: Attach band board to middle joist using 3” screws in pre-drilled holes. Step 20: Attach middle joists to double joist using two 3” screws as shown. © Suncast Corporation Step 21: Repeat steps 18-20 for the remaining middle joists.
Floor Board Installation Step 22: Open the box containing the floor boards. Step 23: Organize floor boards near floor framing as shown. Step 24: Place each of the outside floor boards around the perimeter of the floor. Step 25: Align floor board at center of double joist. Step 26: Attach floor board to floor framing using one 2-1/2” screw as shown. Note: It is recommended to put remaining screws in pre-drilled holes after each of the perimeter boards are in place.
Step 27: Align opposite end of board with center of double joist. Step 28: Make sure the overhang Step 29: Attach floor board using is consistent along the entire one 2-1/2” screw as shown. edge of board. Step 30: Repeat steps 25-28 and install adjacent floor board; attach using one 2-1/2” screw at each end. Step 31: Install remaining perimeter floor boards repeating steps 25-29.
Step 32: Lay out the next complete row of floor boards before attaching any. Step 33: Align boards with edges of floor joists. Step 34: Attach boards to floor joists using 2-1/2” screws. Note: There should be a 1/8”-1/4” space between the rows. Step 35: Pre-drill one 3/16” hole above middle floor joist. Step 36: Attach floor boards to middle joist. Step 37: Repeat steps 33-36 for remainder of floor boards in that row.
Step 38: Repeat steps 32-37 for each remaining row of floor boards. Step 39: Install center floor pieces as shown. Note: The center board may require additional force in order to make it fit. Step 40: Attach middle floor boards to sub-floor using 2-1/2” screws through pre-drilled holes. © Suncast Corporation Floor board installation is complete.
Band Board Trim Installation Step 41: Slide the first band board trim piece in place and align at center of floor corners. Step 42: Make sure trim piece is up tight against bottom of floor board. Step 43: Attach trim board to sub-floor using 1-1/2” screws in pre-drilled holes. Step 44: Align adjacent trim piece and attach repeating steps 41 & 42. Step 45: Repeat steps 41-44 around perimeter of gazebo.
Post & Bottom Railing Assembly Note angle of posts Note: When installing posts, angle at top of posts should slope down toward outside of gazebo. Step 1: Place package as close to assembly site as possible. Step 2: Carefully cut packaging bands. Step 3: Carefully cut open shrink wrap, making sure not to allow product to fall off of the skid. Step 4: Remove the posts and trim strips from package and organize.
Step 5: Remove bottom railing box from the skid, place in close proximity to assembly site, and remove lid. Step 6: Remove top brace sections from package and organize. Step 7: Locate and open the box containing the railing spindles. Step 8: Locate one T-rail piece and one bottom straight rail and align angles. Each railing section contains a top T-rail and bottom straight rail.
Step 10: Make sure angles align on ends of railings. Step 11: Insert railing spindles into each cutout in T-rail making sure each spindle is tight against bottom of cutout. Step 12: Attach T-rail to spindles using three 1-1/2” screws in the pre- Step 13: Lay railing section on the drilled holes along edge of T-rail. ground and push together. Step 14: Attach the straight bottom rail to the spindles repeating step 13. Step 15: Repeat steps 8-14 for the six remaining railing sections.
Step 16: Lay out one complete post trim and railing section including two post trim strips, one bottom railing section, and one top railing section as shown. Step 17: Locate the two spacer blocks included in the package. Step 20: Attach post trim to bottom straight rail using two 2-1/2” screws in the pre-drilled holes. Step 18: Insert one spacer block Step 19:Use the remaining spacer under the bottom railing section. block to space the bottom of railing from the bottom of the post trim.
Step 23: Use the spacer blocks to align the brace section. Step 25: Repeat steps 24-25 for opposite side. Make sure short point at top of post trim is against the ground. Step 24: Attach the post trim to the top brace section using four 21/2” screws in the pre-drilled holes as shown. Section is complete Step 26: Repeat steps 16-25 for six remaining sections. Step 27: Assemble one door section without bottom railing as shown.
Step 30: Rest the post trim on top of the post and pull down tight as shown. Incorrect Correct Step 31: Center the post trim on the post as shown. Step 32: Attach the post trim to the post using five 2-1/2” screws in the pre-drilled holes. Step 33: Repeat steps 30-32 for adjacent doorway post.
Step 34: Install the remaining posts and railing sections repeating previous steps.
Step 35: Center posts on floor splice and space an equal distance from edge of floor. Note: If you did not purchase the optional floor kit, space posts equally and attach to the foundation using appropriate fasteners. All posts should be positioned an equal distance from one corner of the gazebo to the opposite corner. Step 36: Center foundation bracket and fasten to each post using 2-1/2” screws, then attach post bracket to floor or foundation using appropriate fasteners.
Step 38: Place a step ladder in the center of the gazebo. Step 39: Prepare roof bolts by putting a nut and washer on one end of each bolt as shown. Step 40: Slide the rafter into the slot at the top of the post as shown. Step 41: Align the hole in the rafter with hole on the post and push a bolt through. Step 42: Put a washer and nut on the opposite end of the bolt and tighten by hand. Step 43: Install rafter on opposite side repeating steps 28-30.
Step 44: Push compression block into place, pull bottom of rafters tight against lip, and attach using 21/2” screws through pre-drilled holes as shown. Step 45: Repeat steps 40-44 for next set of rafters as shown. Step 46. Install 4 remaining rafters repeating previous steps as shown.
Roof Band Board Installation Step 47: Insert four 2-1/2” screws in the pre-drilled holes in each band board. Step 48: Align band board with top of rafter and at the center of the rafter splice and attach to rafters. Step 49: Align opposite end of band board and attach. Step 51: First attach adjacent band board at opposite corner. Step 50: Align adjacent board. Step 52: Pull band board into place, align with first rafter, and attach.
Roof Board Installation Step 54: Tighten acorn nuts with Step 55: Locate box containing roof boards, open box, remove parts, and organize as shown. tools before installing roof boards. Step 56: Center roof board at rafter splice, align flush with edge of band board, and attach using 2” nails. Step 57: Slide groove of next roof board into the tongue on the previously installed board and attach with two nails at each end as shown. Step 58: Repeat step 57 until entire section is complete.
Step 59: Repeat steps 44-46 for each roof section. Face Board Installation Step 60: Align top of face board flush with top of band board and at center of edge of corner splice. Attach face board using 2” trim nails. Step 61: First align and attach adjacent face board at opposite corner. Step 62: Align corners of face boards and attach to band board. Step 63: Continue installing face board around perimeter of gazebo.
Felt Paper Installation Step 64: Attach felt paper to roof boards using a hammer stapler as shown. Roof Bracket Installation Step 65: Center the bottom point of roof bracket and fasten to roof using 10d nails as shown. Note: Make sure nails go into rafters and 2x4 face board and do not protrude through bottom of ceiling/roof boards. Flower Box Installation Step 66: Install flower boxes where desired using 2”screws.