Installation Guide

page 02
© Suncast Corporation
Step 7: Use the mark from step 5 and lay out double floor joists mak-
ing sure to keep notched end up and towards center as shown.
Step 6: Locate the double floor
joists with notch cut at one end.
Step 8: Lay out the eight perimeter band boards as shown.
Step 9: Align the edge of the band board with center of the double joist and attach each end using two 3”
screws in the pre-drilled holes. Note: It is important that the top edges of the band board and joist
are aligned flush.