Installation Guide

page 05
© Suncast Corporation
Step 17: Arrange middle floor joists to match pattern shown in picture.
Step 19: Attach band board to middle joist using 3” screws in
pre-drilled holes.
Step 18: Align joist with pre-drilled
holes in band board.
Step 20: Attach middle joists to double joist using two 3” screws
as shown.
Step 21: Repeat steps 18-20 for
the remaining middle joists.