Installation Guide

page 04
© Suncast Corporation
Step 13: Center double joist along edge of connecting plate and attach using 3” screws.
Note: There may be some space between joist and connecting plate, but it should not
exceed 1/4”.
Step 14: Repeat step 13 for each of the remaining double joists trying to keep an equal space between
the joist and connecting plate for each board.
Floor is now ready for installation of middle joists.
16: Place one middle joist in each floor section.
Note: Make sure to properly align cut angles of joist.
Step 15: Locate the 16 middle
floor joists.
Incorrect angle alignment