Instructions / Assembly

© Suncast Corporation
page 28
Gable Overhang Assembly & Installation
Step 72: Assemble gable overhang keeping OSB flush at bottom and edges. Fasten OSB to rafters
using 2-1/4” nails spaced 8” apart.
Step 71: Remove gable overhang
pieces from package.
White plywood goes on bottom,
OSB goes on top.
Step 73: Gable overhang ready
for installation.
Step 74a: Install front gable over-
hang...cont.
Step 74b: Align rafter ends flush.
See step 72 below...