Instructions / Assembly
1.
4.
3.
2.
Your unit will arrive completely packaged
and wrapped in plastic (similar to the kit pic-
tured). Leave the packaging intact until the
day you are ready to start assembly.
NOTE: complete site prep work before
starting assembly - unit should be built on a
level, solid surface. 4 to 5 inches of crushed
stone is recommended as a base.
Locate the small OSB cleats.
Locate and lay out oor as shown, stag-
gering the splices for added strength. The
outside band boards are notched where the
2x4 joists will be fastened.
Organize and lay out all the parts.
V G B A M
© S C
P










