Instructions / Assembly
13.
16.
15.
14.
Tip - Be sure the oor is level before pro-
ceeding to the next steps.
Locate studs for front wall framing.
The double door may be installed at several
positions on one of the long walls (left of
center, center, or right of center). The door
could also be installed centered on one of
the short gable walls.
Bottom plate splice - note the notched ends.
Front wall framing - locate 6 notched
2x4’s, as shown.
Note - Notches are cut in top and bottom
wall plates to aid in the proper placement of
the wall studs (24” on center).
V G B A M
© S C
P










