Instructions / Assembly

See step 5 on following page
Step 1: Remove two porch floor boards that are not nailed tight and
carry floor section to front of building.
Step 3: Secure porch floor to
playhouse using 2-1/2” nails or
screws as shown.
Optional Porch Installation
Step 2: Slide back of porch
under door trim and center on
building. The front of the floor
has an extended lip.
Step 4: Replace remaining floor boards and fasten with nails or
screws as shown.
page 11
© Suncast Corporation