Instructions / Assembly

page 7
Step 20: Align gable end rafters with end of wall plate and top of OSB roof sheeting, as shown, and fas-
ten to building using 2-1/2” screws or nails.
Trim, Shutters, & Flower Box Installation
Step 21: Gable end rafters
complete, repeat steps on
opposite gable end.
Step 22: Install fascia trim aligning flush at both ends with end raf-
ters and against bottom of roof sheathing. Fasten with 1-1/2” galva-
nized trim nails.
© Suncast Corporation
Step 19: Install window shutters, top window trim, and flower boxes as shown.