Installation Guide
Part Identification
Door Jamb
(VDJV)
Front Wall Panel
(WP3)
Back/Side Wall Panel
(WP1/WP2)
Base Track
(AL1-AL4)
Corner Post
(CN1)
Floor
(FT1)
Door Lintel
(LT1)
Left Gable
(GHL)
Window Frame
(WF1)
Window Gable Glass
(WGG)
Roof Panel Left
(RPA)
Roof Panel Right
(RPC)
Ridge Beam Joint Cover
(RBJC)
Ridge Beam Cap
(RB1)
Door Trim
(DT1)
Decorative Door Trim
(DET1)
Door Cap
(DC1-DC2)
Door Jamb Aluminum Support
(VDJI)
Door Aluminum Insert
(DPI)
Door Astragal
(AST)
Ridge Beam End Cap
(RBEC)
Door Panel
(DP1)
Shed Tie Strap
(RTS1)
Ridge Beam
(RS1-RS3)
Ridge Beam Splice
(RBS)
Roof Cross Support
(RCS)
Door Hinges
(HA3)
Door Lock
(LK)
Right Gable
(GHR)
Lock Bracket
(LB1)
Door Handle
(HLB)
Roof Panel Center
(RPB)
Wall Cap
(SC1)
• Power drill with Phillips
®
(#2) or a #2 Robertson bit
• Safety glasses • Rubber mallet • 5/16" & 9/64" Drill Bit
• Measuring Tape - Minimum 16' feet (5m) • Level • Gloves
Phillips is a registered trademark of PhillipsScrew Co.
• Silicone Caulking
Tools Required
Materials Needed
7
Part Identification
Door Jamb
(VDJV)
Front Wall Panel
(WP3)
Back/Side Wall Panel
(WP1/WP2)
Base Track
(AL1-AL4)
Corner Post
(CN1)
Floor
(FT1)
Door Lintel
(LT1)
Left Gable
(GHL)
Window Frame
(WF1)
Window Gable Glass
(WGG)
Roof Panel Left
(RPA)
Roof Panel Right
(RPC)
Ridge Beam Joint Cover
(RBJC)
Ridge Beam Cap
(RB1)
Door Trim
(DT1)
Decorative Door Trim
(DET1)
Door Cap
(DC1-DC2)
Door Jamb Aluminum Support
(VDJI)
Door Aluminum Insert
(DPI)
Door Astragal
(AST)
Ridge Beam End Cap
(RBEC)
Door Panel
(DP1)
Shed Tie Strap
(RTS1)
Ridge Beam
(RS1-RS3)
Ridge Beam Splice
(RBS)
Roof Cross Support
(RCS)
Door Hinges
(HA3)
Door Lock
(LK)
Right Gable
(GHR)
Lock Bracket
(LB1)
Door Handle
(HLB)
Roof Panel Center
(RPB)
Wall Cap
(SC1)
• Power drill with Phillips
®
(#2) or a #2 Robertson bit
• Safety glasses • Rubber mallet • 5/16" & 9/64" Drill Bit
• Measuring Tape - Minimum 16' feet (5m) • Level • Gloves
Phillips is a registered trademark of PhillipsScrew Co.
• Silicone Caulking
Tools Required
Materials Needed
7