Installation Guide
2 | P a g e
NOTICE TO INSTALLERS (READ ME FIRST):
1. Tub must be leveled in final resting position, mark the placement, and level. All feet
must touch the floor.
2. It is advised to have the tub onsite before preparing drain location.
3. Holes for the drain and overflow are to be made by installer. The centers are marked.
The hole for drain is 2in or 51mm. The hole for the overflow is 2 ½ in or 64mm.
4. Make sure the floor can withhold the weight of the product.
5. This is a freestanding tub. You must account for the length of the skirt if tiling around
the tub.
6. Make sure door assembly is installed and tested for water leakage before tiling around
the tub. If there is a problem with the door sealing, you will have more adjustment
options available to correct the issue.
7. Heated air jet system requires 110V / 15 amp dedicated line
8. When installing the HW series tubs with the air system it is important to check the clear
airline that connects the air switch (on the motor) to the air push button installed in the
tub. This is the line that will start and stop the air pump. It sometimes comes off during
installation. The tub can be tested without any water, with no resulting damage.
9. The air pump has 3 speed settings. Pressing the push button once will start the pump on
high, pressing it a second time will slow the pump to medium, a third time will set the
pump to low and the fourth time will shut off the pump.
10. After the air pump has been turned off for approximately 20 minutes it will come on
automatically and run to blow the water out of the lines, it will stop after about 1 to 2
minutes; this is called the purge cycle. You cannot manually stop this cycle once it starts
but it will stop automatically.
11. Heated Air system requires 110/120V 15 amp breaker
Manufacturer reserves the right to change specs or features at any time. Please check to confirm details. 1-866-783-2661










