Installation Guide

4 | P a g e
TUB INSTALLATION
1. Walls and floor must be clear of any debris. Note: Tub
comes with 90 degree drain; make sure your drain
location will work with the drain.
2. Remove the skirt from the tub for easy access.
*Please allow room for the skirt after installation.
3. Place tub in final resting place, making sure tub is level
and all feet are properly supporting tub. Adjust the feet if
necessary.
4. Water test:
Before finish work is done, the tub has to be checked for
leaks. Close and lock the glass door. Fill the tub to the
overflow control.
NOTE: Any gaps between the skirt and the tub can be
caulked with latex caulk. The caulk can be removed and
replaced when the tub needs service.
5. Reattach the skirt.
Note: The air jet system will automatically turn back on
approximately 15 minutes after each use. This cycle
flushes out and cleans the pipes.