Operation Manual

30
OPERATION
AC PARALLEL OPERATION
Before connecting an appliance to either generator, make sure that the
appliance is in good wo
rking order and that its electrical rating does not
exceed that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When
an electric motor is started, the overload indicator (red)
may come ON. This is normal if the overload indicator (red) goes OFF
within 4 seconds. If the overload indicator (red) stays ON, consult your
generator dealer.
During parallel operation, the Eco-Throttle switch should be in the same
position on both
generators.
1.Connect the parallel operation cable (optional equipment) between
the two EU1000i
generators following the instructions supplied with
the parallel operation cable.
2.Start the engines (see page 22) and make sure the output indicator
(green) on each generator comes ON (see page 27).
31Z40600.book 30 ページ 2013年5月27日 月曜日 午前11時28分