Replacement Part List
30
OPERATION
AC PARALLEL OPERATION
Before connecting an appliance to either generator, make sure that
the appliance is in good working order and that its electrical rating
does not exceed that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motor is started, the overload indicator (red)
may come ON. This is normal if the overload indicator (red) goes OFF
within 4 seconds. If the overload indicator (red) stays ON, consult your
generator dealer.
During parallel operation, the Eco Throttle switch should be in the
same position on both generators.
1. Connect the parallel operation cable (optional equipment) between
the two EU1000i generators following the instructions supplied with
the parallel operation cable.
2. Start the engines (see page 22) and make sure the output indicator
(green) on each generator comes ON (see page 27).
PARALLEL OPERATION CABLE
(optional equipment)
31Z406030.book 30 ページ 2017年3月14日 火曜日 午後2時49分