User's Manual

Vertex SF System
17
User Manual
NOTE
When reconnecting the analyzer, connect the Analyzer Communications cable to the
analyzer first.
Install an Analyzer
1.
Reach into the slot and position cables out of the way.
2.
Place analyzer on slides. Push in until locks engage.
3.
Slide Analyzer out until fully extended.
4.
Reach behind the analyzer; connect and lock the tubing harness.
5.
Connect the Analyzer Communications, 24V Power Supply, Multifunction Connector.
6.
Carefully push analyzer partially into the cabinet and then pull out to verify all cables move
freely and the slides lock. Repeat in and out action to loosen slide. Push analyzer into cabinet.
Return to Service
1.
Turn analyzer power switch on.
2.
Re-install the Configuration Profile.
3.
Install the Chemcassette.
4.
Return analyzer to monitor mode in Runtime Options Menu