User's Manual

18 - 5
Installation Hardware
1. Attach the mounting bracket to dry, stable surface.
2. Then, using the appropriate nuts and bolts, secure the Charge/Net Rack to the mounting bracket.
H-Bracket to the Mounting Surface
Mount Type Drill Size Washer Bolt
Hollow Wall (e.g., Steel
stud or cinder block)
7/8" 3/8" Flat Washer, Qty. 4 Zinc-Plated Steel Toggle Bolt, Round
Head, 3/8" Dia., 4" Length (2-5/8" Usable
Length Required), Qty. 4
Wood Stud 1/4" 3/8" Flat Washer, Qty. 4 Hex Head (Lag Screw), Steel, Zinc-plated,
3/8" thread, 2-1/2" Length, Qty. 4
Charge/Net Rack to the H-Bracket
Washer Bolt Additional
3/8" Flat Washer, Qty. 4 3/8"-16 , Cap Screw, Zinc-plated, 1"
length, Grade 5, Qty. 4
3/8"-16 Nut for Strut Channel W/Spring,
Zinc, for 13/16" Deep Strut, Qty. 4
150lbs. Max recommended load on H-Bracket (this is approx. 40lbs. Over a fully loaded rack)
Use bracket and available studs to determine hole pattern (bracket to wall fasteners must be spaced at a minimum of 16"
apart horizontally)
Preliminary Draft 1/19/11