Home Security System User Manual
Table Of Contents
- ONYX®FirstVision™
- Fire Alarm System Limitations
- Installation Precautions
- FCC Warning
- Section 1 Introduction
- Section 2 FirstVision Installation Instructions
- Section 3 Enabling FirstVision to Monitor Your Building
- 3.1 Process Overview
- 3.2 Make Connections to FirstVision
- 3.3 Turn on Power to FirstVision
- 3.4 Set the FirstVision Clock and Time Zone
- 3.5 Establish Communication Between Your LAN and FirstVision
- 3.6 Establish Gateway Communication
- 3.7 Copy Your Exported Building Design to FirstVision
- 3.8 Display Your Building Design on FirstVision
- 3.9 Test Your Building Design on FirstVision
- 3.10 Touch Screen Calibration
- Section 4 Operating Basics of FirstVision
- 4.1 Normal Operation (No Events Being Reported)
- Figure 4.1 FirstVision Display Example: No Alarms
- Figure 4.2 FirstVision Display Example: Floor Number Button
- Figure 4.3 FirstVision Display Example: Building Information
- Figure 4.4 FirstVision Display Example: Zoomed Floor Plan
- Figure 4.5 FirstVision Display Example: Moving Through a Zoomed Floor Plan
- Figure 4.6 FirstVision Display Example: HAZMAT Information
- 4.2 Investigating Gateway Disconnection
- 4.3 Operation When a Fire Alarm is Received
- 4.4 Operation After a Fire Alarm Has Been Cleared
- 4.5 Accessing the Log File
- 4.1 Normal Operation (No Events Being Reported)
- Section 5 The Development of FirstVision
- 5.1 The Current Situation for a Firefighter
- 5.2 The Technology of FirstVision
- 5.3 Expected Firefighter Interaction with the FirstVision
- 5.3.1 Example Emergency Situations
- Figure 5.1 Fire Scene Scenario Floor Plan Information
- Figure 5.2 Fire Scene Scenario Roof Plan Information
- Figure 5.3 Fire Scene Scenario HAZMAT Information
- Figure 5.4 Fire Scene Scenario Building Information
- Figure 5.5 Example Building Site Plan Information
- Figure 5.6 Example HAZMAT Information
- Figure 5.7 Example Contact Information
- 5.3.1 Example Emergency Situations
- Index
Copy Your Exported Building Design to FIRSTVISION Enabling FIRSTVISION to Monitor Your Building
25FIRSTVISION™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07
3.7 Copy Your Exported Building Design to FIRSTVISION
This copying task can be accomplished using various methods. The copying method will be
contingent on your connection to F
IRSTVISION. With FIRSTVISION and your PC both (i.e. where
your building design Site.xml file and Floor plan folder are stored) as part of a TCP/IP network,
you can copy your building design to F
IRSTVISION over the network. You can also use a USB
connector, located inside the locking door, on F
IRSTVISION as the connection point.
Figure 3.15 F
IRSTVISION USB Connector Locations
3.7.1 How To Copy Your Exported Building Design to FIRSTVISION
Step 1. Establish a physical connection between your PC or storage device (i.e. where your
building design Site.xml file and Floorplan folder are stored) and F
IRSTVISION.
Step 2. Use Window Explorer on F
IRSTVISION to find, select, and copy the Site.xml file and
"Floorplans" folder to the following folder on F
IRSTVISION: C:/Facilities Monitoring/FIT.
Figure 3.16 XML File and Floorplans Folder
Step 3. You should now restart F
IRSTVISION and wait until Windows is displayed.
Step 4. You should now peform “Display Your Building Design on F
IRSTVISION” on page 26.
NOTE: Overwrite the folder and files, do NOT delete the existing site.xml and Floorplans folder.
prior to this step.