AQ2558P2X Installation Job Record

INSTALLATION JOB RECORD
AQ25582B Expansion Zoning Panel for 8 Pumps
System commissioning date: _________________________
Customer: _______________________________________
Building address: _________________________________
INSTRUCTIONS:
Fill in the details of the equipment connected to the zoning module:
A Low voltage thermostats (for each of the 2 modules)
B Line voltage pumps (for each of the 2 modules)
C Review and set DIP switch settings - once the DIP switches have been set, complete the “Installer settings” diagram by filling in the circles
to indicate the DIP switch position (for each of the 2 modules)
File this with other installation records for equipment used on this installation.
A1 Zoning Thermostats
B1 Zoning Pumps
A2 Zoning Thermostats
B2 Zoning Pumps
Terminal # 5-6 7-8 9-10 11-12
Terminal ID TH1 TH2 TH3 TH4
Function Zone call for heat
Equipment
Manufacturer
Model #
Date Code
Notes
Terminal ID Zone 1 Zone 2 Zone 3 Zone 4
System Zone #
Function Zone control
Equipment Pump Pump Pump Pump
Manufacturer
Model #
Date Code
Power draw
Amps
Notes
M27621A
Zone 1
Zone 2
Zone 3
Zone 4
C1 DIP switch
(See back for
settings)
Terminal # 5-6 7-8 9-10 11-12
Terminal ID TH1 TH2 TH3 TH4
Function Zone call for heat
Equipment
Manufacturer
Model #
Date Code
Notes
Terminal ID Zone 1 Zone 2 Zone 3 Zone 4
System Zone #
Function Zone control
Equipment Pump Pump Pump Pump
Manufacturer
Model #
Date Code
Power draw
Amps
Notes
M27621A
Zone 1
Zone 2
Zone 3
Zone 4
C2 DIP switch
(See back for
settings)

Summary of content (2 pages)