GPS Receiver User Manual

4. Turn on the KLN 94. Press F
as required to approve the Self
Test, Initialization, and Database
pages. Use the right outer knob
to select the Setup (SET) type
pages and the right inner knob to
select the SET 3 page (figure 2-
2).
5. Press B. Update Pub DB?
will now be flashing as in figure
2-3.
6. Press F. The estimated load
time in minutes is now displayed
(figure 2-4).
NOTE: In step 6, repeatedly press-
ing E will terminate the update
process and bring the display back
to the original SET 3 page shown in
figure 2-2.
7. Press F to acknowledge the estimated load time and begin the
erasing of the existing database.
The unit will now display
Erasing database. After the
database has been erased, the
loading of the new data automat-
ically begins. As the new data is
being loaded, the percentage of
transfer is displayed (figure 2-5).
8. The KLN 94 will indicate when
the database update is complete
as shown in figure 2-6. You may
either turn the KLN 94 off at this
point or press F to restart the
KLN 94.
9. Remove the interface cable. Remove the disk from the computer.
Turn off the computer.
KLN 94 Pilot’s Guide Chapter 2 Data Base
2-7
Figure 2-2
Figure 2-3
Figure 2-4
Figure 2-5
Figure 2-6