Operation Manual

Introduction
Introduction2
These installation and operating instructions contain all the information required for installation,
commissioning and configuring the underfloor heating controller HCE80(R) / HCC80(R).
All the operating elements and connections are shown on a fold-out page.
1
Fold out the left-hand cover.
Leave the cover folded out while reading further.
Legend for fold-out page
Fig. 1 Scope of delivery
Fig. 2 Opening the housing
Fig. 3 Display and operating elements
(1)
Power
Power supply on/off
(2)
Information display
(3)
Installation display
(4)
Mode
Operating mode button
(5)
Installation button
(6)
Pump off/off display
(7)
1...8
Zone LEDs
(8) Labelling of Zones 1...8
Fig. 4 Connections
(9) I/O
connector
(10) Switch for setting normally
open/normally closed
(11) Slot for expansion module HCS80
(12) Connector for supply voltage, pump
(13) Fuse
(14) Slot for internal antenna
(Z1...Z8) Connector for Zones 1...8
Fig. 5 I/O connector
Fig. 6 Connector for Zones 1...8
Fig. 7 Connector for supply voltage, pump