Install Instructions
33 65-0100—2
12
Q7800
13
14
15
16
18
17
19
20
21
22
G
L2
9
8
7
6
5
4
3
10
F
G
L2
9
8
4
7
M2514B
A
6
F1
GENERAL FOOTNOTES, SEE PAGE 5.
A
B
E
D
1234
5 78
15
18
C
C
C
B
7800 SERIES CONVERSION WIRING DIAGRAM
FROM________________________________ TO ______________________
(DEVICE TO BE MODERNIZED) (O.S. NUMBER OF RELAY MODULE TO BE USED)
L1&3
C
E
D
LOCATE THIS JUNCTION
AND CONNECT IT TO
Q7800 SUBBASE
TERMINAL 6
LOCATE THE START INTERLOCKS AT THIS POINT AND
CONNECT IT TO Q7800 SUBBASE TERMINAL 20.
START INTERLOCKS NOW BECOME PREIGNITION
INTERLOCKS. IF START INTERLOCKS ARE NOT USED,
JUMPER Q7800 TERMINALS 4 TO 20.
LIMITS
CONTROLLER
START
INTERLOCKS
AIRFLOW
SWITCH
L1
3
4
12
13
14
11
MAIN VALVE
10
IGNITION
TRANSFORMER
FOR DIRECT SPARK IGNITION
(OIL OR GAS)
8
9
L2
For Insurance Requirements
5
Q535 OR Q536 SUBBASE HAD U1 AND U2
TERMINALS THAT WERE USED FOR
C7020 AND C7012E,F FLAME DETECTORS.
A. TO MODERNIZE C7020 APPLICATIONS,
CHOOSE A NEW DETECTION AND
REWIRE PER RM7840/RM7800
SPECIFICATIONS.
B. TO MODERNIZE A C7012E,F
APPLICATION, USE THE EXISTING
SENSOR AND REWIRE PER
RM7840/RM7800 SPECIFICATIONS.
TERMINAL 6 PROVIDED 30 SECOND MFEP.
THE REPLACEMENT CONTROL WILL
PROVIDE 15 SECOND MFEP.
INTERLOCKS
RM7840L/
RM7800L
RM7840E/
RM7800E
RUNNING INTERLOCKS 6–7 6–7
PREIGNITION INTERLOCKS 4–20 4–20
HIGHFIRE SWITCH* 5–19 4–19
LOWFIRE SWITCH* 5–18 5–18
* JUMPER WILL ADD ADDITIONAL 30 SECONDS
TO THE PREPURGE TIMING
TO MODERNIZE TO AN RM7840L,E OR
RM7800L,E TO MEET INSURANCE
REQUIREMENTS, THE FOLLOWING
INTERLOCKS ARE NORMALLY REQUIRED.
(CONNECT OR JUMPER INTERLOCKS AS
SHOWN TO THE Q7800 SUBBASE TERMINALS).
3
R4126A1008, A1016, A1024, A1032 A1040,
A1057, A1081, A1149
R4126B1006, B1014, B1022
RM7840E1016, RM7800E1010
RM7840L1018, RM7800L1012