S9200U Installation Guide

Table Of Contents
S9200U1000 UNIVERSAL HOT SURFACE IGNITION INTEGRATED FURNACE CONTROL
69-2075EF—05 12
factory-set to zero (0) seconds. To change it, first
disconnect the power, then set SW1 on DIP switch S1
according to Table 9 on page 11.
HEAT FAN ON DELAY TIMING
The Heat Fan On Delay is the period between entering
the Trial for Ignition period and the activation of the
blower motor at the heat speed (if the Trial for Ignition
is successful). The default factory setting is 30
seconds. To change it, first disconnect the power, then
set SW2 on DIP switch S1 according to Table 9 on
page 11.
HEAT FAN OFF DELAY TIMING
The Heat Fan Off Delay is the period between the loss
of supervised main burner flame after the call for heat
has ended and the deactivation of the blower motor at
the low heat speed. The timing is factory-set to 120
seconds. To change it, first disconnect the power, then
set SW3 and SW4 on DIP switch S1 according to
Table 9 on page 11.
DIP Switch S2 - Safety Timings
Table 10 and Fig. 7 describe the S2 DIP switch
settings. The default factory settings are all OFF and
are shown in bold.
Fig. 7. DIP Switch (S2) shown with factory default
settings; all OFF.
THERMOSTAT TYPE
The S9200U1000 will accept either a conventional 24
Vac, 1-Stage Heat, 1-Stage Cool thermostat or the
VisionPRO or FocusPRO EnviraCOM™ enabled
thermostats.
NOTE: When using a conventional 24 Vac thermo-
stat, set the Heat Anticipator to 0.1 A.
TWINNING
EnviraCOM™ communication between two
S9200U1000 controls permits the controls' use in
Twinning applications. When a second S9200U1000
is sensed on the EnviraCOM™ Bus, each S9200U1000
control proceeds into Twinning Mode. If one of the two
S9200U1000 controls is removed from a Twinning
application, the remaining control reverts back to
standard operation only after power to the control is
cycled.
For twinning applications, Honeywell recommends
that DIP switch S1 be set to the same positions on
each device so that the heat/cool fan on/off delay
times are equal for both devices. Otherwise, the
shorter Fan On delay and the longer Fan Off Delay
times are used for both devices.
See Fig. 8 for typical wiring connections.
IMPORTANT
1. For Twinning applications, two S9200U1000
controls must be used.
2. Always power down appliances when wiring
the controls in Twinning applications. Failure
to do so may result in delays in the control's
registration on the EnviraCOM™ Bus.
3. Fan timing changes may be detected when
two appliances are Twinned.
.
Fig. 8. Typical wiring for Twinning application.
Table 10. DIP Switch (S2) Settings - Safety Timings.
DIP Switch S2 Descriptions
Individual Switches
SW1 SW2
HSI Igniter Warm-up Time = 17/27
a
seconds
Trial For Ignition = 4 seconds:
– Ignition Activation Period = 1 second
– Flame Recognition Period = 3 seconds
This is the default setting.
a
The shorter of the two periods listed (17 seconds)
applies to the first trial only, while the longer period
(27 seconds) applies to the subsequent trials during
the same call for heat.
OFF OFF
HSI Igniter Warm-up Time = 17/27
a
seconds
Trial For Ignition = 6 seconds:
– Ignition Activation Period = 3 seconds
– Flame Recognition Period = 3 seconds
OFF ON
HSI Igniter Warm-up Time = 30/30 seconds
Trial For Ignition = 6 seconds:
– Ignition Activation Period = 3 seconds
– Flame Recognition Period = 3 seconds
ON OFF
HSI Igniter Warm-up Time = 30/30 seconds
Trial For Ignition = 8 seconds:
– Ignition Activation Period = 5 seconds
– Flame Recognition Period = 3 seconds
ON ON
S2
M24910
SAFETY TIMINGS
ON
12
ON
M24917B
EnviraCOM™
THERMOSTAT
CONVENTIONAL THERMOSTAT
Y
G
W
C
R
E-COM
D/1C/3R/2WGY
E-COM
D/1C/3R/2WGY
USE ONLY ONE THERMOSTAT WITHIN THE SYSTEM.
1
1
AC/C
UNIT
GND
3
2
1