VisionPRO 8000 Spec Sheet 2017
Table Of Contents
- Application
- Features
- Contents
- Specifications
- System Installation
- Installation Options
- Guidelines for Installing RedLINK Devices
- Installing Equipment Interface Module (if used)
- Wiring 24 Vac Common
- Selecting Discharge and Return Air Temperature Sensor Mounting Locations
- Installing Discharge and Return Air Temperature Sensors
- Selecting Thermostat Location
- Installing Wallplate
- Installing VisionPRO® 8000 with RedLINK™
- Wiring the Thermostat
- Remove Coin Cell Battery Tab
- Mounting Thermostat on Wallplate
- Power Optional RedLINK™ Accessories
- Performing Initial Setup
- Installer Tests
- Operation
- Setting the Time/Date
- Setting the Fan
- Setting System Mode
- Adjusting Program Schedules
- Overriding Schedules: Residential Use
- Overriding Schedules: Commercial Use
- Viewing Equipment Status
- Setting Vacation Hold: Residential Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Remote Setback: Commercial Use
- Adjusting Humidification Settings
- Adjusting Dehumidification Settings: Residential Use
- Adjusting Dehumidification Settings: Commercial Use
- Adjusting Ventilation Settings
- Ventilation Options
- Setting Preferences
- Cleaning the Thermostat Screen
- Adjusting Security Settings
- Viewing Dealer Information
- Advanced Features
- Installer Options
- Using the Temperature Display
- Using the Humidity Display
- Universal Outputs (U1, U2, U3)
- Universal Inputs (S1, S2, S3, S4)
- Data Logs
- Dry Contact Alerts
- Set Up the Dry Contact Alerts
- Staging Control
- Heat Pump and Backup Heat Operation
- Indoor Air Quality (IAQ) Control
- IAQ Reminders
- Customizable Reminders
- MicroSD card
- Commercial Features
- Overriding Schedules: Commercial Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Ramp Rates (Commercial Use)
- Remote Setback (Commercial Use)
- Economizer and Time of Day (TOD) Operation
- Pre-Occupancy Purge
- Battery Replacement
- Optional Accessories
- Portable Comfort Control
- Remote Indoor Sensors
- Replacing a Thermostat
- Replacing an Equipment Interface Module
- Wiring
- Zoning
- Troubleshooting
- Regulatory Information
VISIONPRO
®
8000 WITH REDLINK™
68-0312—05 62
Fig. 89.
NOTE: To reduce costs, use the “Preset Energy-Saving
Schedules” on page 61.
3. Select the days to schedule, touch Next.
Fig. 90.
4. Touch or to set your Wake time for selected
day(s).
5. Touch or to set Heat and Cool temperatures for
the Wake period.
6. Touch other time periods (Leave, Return, Sleep) to set
time and temperatures for each.
7. Touch Done to save and exit (Touch Cancel to exit
without saving changes).
Fig. 91.
NOTE: Touch Cancel Period to eliminate any unwanted
time period.
Touch Fan Setting to customize fan settings for
any time period.
Overriding Schedules: Residential
Use
1. Touch or to adjust the temperature (right side of
screen) and the Hold Until time (left side). The sched-
ule will resume when the Hold Until time expires.
Fig. 92.
2. Select Permanent Hold to keep the same tempera-
ture until you change it or resume the program
schedule.
Touch Cancel Hold at any time to resume the program
schedule.
Overriding Schedules: Commercial
Use
Touch or to adjust the temperature. It will be
maintained until the hold time you set.
• To change the hold time, touch the Hold Until arrow
buttons. This time can be adjusted up to the maximum
time set by the installer.
Fig. 93.
MCR34102
Use Scheduling
Assistant?
MCR34151
Select the days
to schedule
MCR34152
Set Wake
time & temperature
MCR34103
Temporary Hold
Permanent Hold
MCR34169