VisionPRO 8000 Spec Sheet 2017
Table Of Contents
- Application
- Features
- Contents
- Specifications
- System Installation
- Installation Options
- Guidelines for Installing RedLINK Devices
- Installing Equipment Interface Module (if used)
- Wiring 24 Vac Common
- Selecting Discharge and Return Air Temperature Sensor Mounting Locations
- Installing Discharge and Return Air Temperature Sensors
- Selecting Thermostat Location
- Installing Wallplate
- Installing VisionPRO® 8000 with RedLINK™
- Wiring the Thermostat
- Remove Coin Cell Battery Tab
- Mounting Thermostat on Wallplate
- Power Optional RedLINK™ Accessories
- Performing Initial Setup
- Installer Tests
- Operation
- Setting the Time/Date
- Setting the Fan
- Setting System Mode
- Adjusting Program Schedules
- Overriding Schedules: Residential Use
- Overriding Schedules: Commercial Use
- Viewing Equipment Status
- Setting Vacation Hold: Residential Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Remote Setback: Commercial Use
- Adjusting Humidification Settings
- Adjusting Dehumidification Settings: Residential Use
- Adjusting Dehumidification Settings: Commercial Use
- Adjusting Ventilation Settings
- Ventilation Options
- Setting Preferences
- Cleaning the Thermostat Screen
- Adjusting Security Settings
- Viewing Dealer Information
- Advanced Features
- Installer Options
- Using the Temperature Display
- Using the Humidity Display
- Universal Outputs (U1, U2, U3)
- Universal Inputs (S1, S2, S3, S4)
- Data Logs
- Dry Contact Alerts
- Set Up the Dry Contact Alerts
- Staging Control
- Heat Pump and Backup Heat Operation
- Indoor Air Quality (IAQ) Control
- IAQ Reminders
- Customizable Reminders
- MicroSD card
- Commercial Features
- Overriding Schedules: Commercial Use
- Setting Holiday/Event Schedules: Commercial Use
- Setting Custom Events: Commercial Use
- Setting Holiday Schedule: Commercial Use
- Setting Holiday Override: Commercial Use
- Initiating Occupancy Mode: Commercial Use
- Ramp Rates (Commercial Use)
- Remote Setback (Commercial Use)
- Economizer and Time of Day (TOD) Operation
- Pre-Occupancy Purge
- Battery Replacement
- Optional Accessories
- Portable Comfort Control
- Remote Indoor Sensors
- Replacing a Thermostat
- Replacing an Equipment Interface Module
- Wiring
- Zoning
- Troubleshooting
- Regulatory Information
VISIONPRO
®
8000 WITH REDLINK™
95 68-0312—05
(1) Lockout Ventilation during Outdoor Condi-
tions (ISU 1013)
(2) Lockout Ventilation on Humidification or
Dehumidification Calls (ISU 1014)
(3) Lockout Ventilation during “Sleep” (Residen-
tial) or “Unoccupied” (Commercial) program
periods. Note: This option is set by the user on
the Ventilation screen in the Menu.
d. ASHRAE is Priority: ASHRAE requires additional
ventilation following a long off cycle. The thermo-
stat meets the ASHRAE 62.2 ventilation standard
by running additional ventilation when outdoor
conditions are favorable. If ASHRAE cannot be
met when outdoor conditions are favorable, the
thermostat will override the outdoor lockouts and
run ventilation. When using this option, it is rec-
ommended to increase the rate (CFM) of the ven-
tilation equipment to meet the ASHRAE 62.2
ventilation standard in a shorter run time.
NOTE: ISU 1014 Lockout Ventilation on Humidifi-
cation or Dehumidification Calls is not an
option when you select ASHRAE is Priority.
The ability to lockout ventilation during the
“Sleep” or “Unoccupied” program periods is
not an option when you select ASHRAE is
Priority.
Fig. 232.
8. If Percent On Time was selected for ISU 1005, select
the Ventilation Percent on Time. See Fig. 233.
Fig. 233.
9. Select the Outdoor Condition Lockouts. See Fig. 234.
See “Ventilation — Outdoor Condition Lockouts (ISU
1013)” on page 93 for more information.
Fig. 234.