user manual

Power Wiring
January 2009 UDA2182 Universal Dual Analyzer Product Manual 15
4 Power Wiring
4.1 Overview
Introduction
This section contains instructions for installing ac power wiring for the Analyzer, in
preparation for performing configuration setup as described in Section 6.
We recommend that you wait to install input and output wiring (See Section 7) until after
Configuration Setup. During configuration the software will determine for you, which
relay to use for each feature.
What’s in this section?
The topics in this section are listed below.
Topic See Page
4.1 Overview 15
4.2 General Wiring Practices 16
4.3 Power Wiring Considerations 17
4.4 Installing Power Wiring 17