Honeywell DOUBLE: Ed THE V5047A 1S A DOUBLE-SEATED, ELECTRIC MOTOR OPERATED VALVE FOR CONTROL OF HIGH PRESSURE STEAM, LIQUIDS, AIR OR NONCOMBUSTIBLE GASES WHERE POSITIVE FINAL SHUTOFF IS NOT REQUIRED. (J Suitable for 2-position, floating, or proportioning control, depending on the motor and controller used. O Provides high capacity with minimum pressure drop. (J Pipe sizes include 1, and 2 inches. [J Straight-through construction and screwed end connections.
MODEL: V5047A Valve-double-seated valve for control of ‘high pressure steam, liquids, air, or noncombustible gases where positive finial shutoff is not required. VALVE BODY: straight-through type. Material —cast iron. Pressure Rating—125 psi ANSI (nominal). End Connections— screwed. Marking—arrows on both sides of valve to show direction of flow. PIPE SIZES: 1, and 2 inches. VALVE RATINGS: TRIM: Materials—all trim is either bronze or stainless steel, as ordered.
ACTUATOR TYPE (order separately). Modulator motor with Q601K or Q601L linkage. Linkage connects valve stem to crankshaft of Modulator mayor. MODULATOR MOTOR {order separately). Capacitor or shaded pole type with oil-immersed gear train, available with or without spring return. IMPORTANT Spring-return motors {2-position M445, M845; and M934 non spring-return motor (modulating) must use a QUILL linkage {80 1b}.
chis Lo pik = a Lal bookstall LOCATION Select a location where: 1. The valve, linkage, and motor to be used will be within their ambient pressure and temperature ratings, 2. The valve can be mounted with its stem vertical. 3. The Modulator motor can be mounted with the motor shaft horizontal for proper lubrication of the motor. 4, There is enough clearance above the valve for installation of the linkage and motor (about 20 inches— see Fig. 2). MOUNTING 1.
2. Teflon asbestos packing can be adjusted by tightening the packing box nut to stop leakage. Adjust. men should be only hand tight to avoid excessive friction. If leakage continues, replace packing. 3. Spring-loaded Teflon cone packing cannot be adjusted, and packing box aut should be tightened all the way down. Packing must be replaced if leakage occurs. 4. Tighten all mechanical and electrical connections.
WARRANTY "Pros otherwise specialized, the Paraguayan warrants 4h Residential Division squadron manufactured by 3 15 Bering 1 nameplate 10 be veo from Detects in workmanship nd material under normal uss and service 31 follow 1. Equipment site is received transportation prepaid at the factory urinating shipment (1) wishing twelve months sties sand of malpractices, or (2) with a glorification by th installer to be. \ammonia operative months after date of installation, and found by the Company's inspection to b