Instruction Manual
MAN0886-04-EN       Specifications / Installation
__________________________________________________________________________________________________________________________________________________________________ 
3/2/2010      Page 2 of 6        #1037 
2  Installation 
1.  Prior to mounting, observe requirements for the panel layout 
design and spacing/clearances  in  the  OCS  XL6 Series Manual 
(MAN0883). 
2. Cut the host panel. 
3. Insert the OCS through the panel cutout (from the front). The 
gasket material needs to be between the host panel and the 
OCS. 
4. Install and tighten the mounting clips (provided with the OCS) 
until the gasket material forms a tight seal. 
5. Connect cables as needed such as communications, 
programming, power and CsCAN cables to the ports using the 
provided connectors. 
6.  Begin configuration procedures. 
3  Panel Cut-Out and Dimensions 
Note: Max. panel thickness: 5 mm. 
Refer to the XL6 User Manual (MAN0883) for panel box information and a handy checklist of 
requirements. 
Note: The tolerance to meet NEMA standards is 
±
 0.005” (0.1 mm). 
Caution: Do 
not
 force the OCS into the panel cutout. 
An incorrectly sized panel cutout can damage the 
touch screen. 
HE-XL1x3/ HE-XL1x4
001XLQX007
6.875”
[175mm]
[131mm]
001OCS003-R1
5.156”
R .125” [3 mm] TYP.
RADIUS CORNERS
WHEN REQUIRING
DUST OR WATER
TIGHT SEAL PER
NEMA 4, 4X OR 12






