Service Manual

11
II. Sequence of Operation and Service Diagnosis
The steps in the sequence are as outlined below.
A. Sequence of Operation Flow Chart
1. UR/WR: Refrigerator
Legend:
Comp-compressor
ConFM-condenser fan motor
CTh-cabinet thermistor
DLT-defrost lockout timer
DT-defrost timer (cumulative)
DTh-defrost thermistor
EvapFM-evaporator fan motor
Note:
a) 2-min. minimum Comp on timer starts when Comp energizes
b) 2-min. minimum Comp off timer starts when Comp de-energizes
c) 5-hr. cumulative compressor run-time defrost timer
d) 5-min. minimum defrost time
e) 55-min. maximum defrost time
f) 1-hr. minimum between defrost cycles (DLT)
*
1. Startup/Cool Down
Comp energized
ConFM energized
EvapFM energized
5-hr. DT starts
Comp de-energized
ConFM de-energized
EvapFM de-energized
UR/WR - Refrigerator Sequence Flow Chart
2. Cool Down Achieved
4. Defrost
CTh above setpoint
CTh cools to setpoint
CTh above
setpoint
Defrost Termination:
45°F (7.2°C) achieved or
55 min. maximum DT
terminated.
CTh in control
1-hr. DLT terminates
Evap. temp. at or below -4°F (-20°C)
or 5-hr DT terminates
5-min. min. DT starts
55-min. max. DT starts
Comp de-energized
ConFM de-energized
EvapFM energized
Defrost: Temperature or
Time achieved.
DTh achieves -4°F(-20°C)
or 5-hr. DT terminates
Power on
Yellow LED On
(10-sec. Delay)
Evap. Temp. achieves 45°F (7.2°C)
or 55-min. DT terminates,
Defrost Terminated
1-hr. DLT starts
5-hr. DT starts
Comp energized
ConFM energized
EvapFM energized
*
DTh in control
5. Defrost Termination
3. Cool Down Restarts
5-min. minimum and
55-min. maximum
DT starts
*
Red, Yellow, and
Green LEDs Cycle
*
*
Red and Green LEDs on
Yellow LED off
Green LED on
Red and Yellow LEDs off
*
*
*
*