Installation guide

Dishwasher Installation
STEP 20: REPLACE ACCESS PANEL AND
TOEKICK
In this step gou will need the panels and the two
screws set aside in Step 4.
There are two tgpes of screws used. The 8-32 x 1/4"
screws are used at the top of the access panel and
should still be in place. The 10-16 x ]/8" screws are
used at the bottom of the access panel and secure
both the access panel and toekick.
STEP 21: LITERATURE
[] Leave the Owners' Hanual, Installation
Instructions, samples, and/or coupons with
consumer.
IMPORTANT - Screws are not
interchangeable. To prevent damage to gour
dishwasher, use the proper screw in the proper
location. Do not mix screw tgpes or lengths.
Place the toekick against the legs of the
dishwasher.
Remove the two 8-32 x 1//4" machine thread
screws.
Align the access panel to the dishwasher.
Select the two 8-32 x 1//4" machine thread screws
just removed and insert them through the top
holes in the access panel and into the dishwasher
frame.
Tighten these screws.
Align the toekick and make sure the bottom edge
is against the floor.
Insert and tighten the two 10-16 x 3/8" sheet metal
thread screws, making sure the bottom edge of
the toekick stags in contact with the floor.
Remove, then Reinstall and Tighten
8-52 x 1/4"
Machine Thread Screws
Access Panel
Install and Tighten
10-16 x 3/8"
Sheet Hetal Thread Screws
Figure AA
Tip: Prevent tub damage and reduce sound from
under the dishwasher
Use the machine thread screws in the top holes and
the sheet metal thread screws in the bottom holes.
Hake sure the toekick is against the floor.