Installation Guide

4
5
6
Once cut, remove the balusters by slowly
pushing them back and forth until the nails are
worked loose.
Remove the existing nails from the rail and
base using pliers.
Now is a good time to layout your new iron
balusters against the rail to make sure your
pattern and spacing are correct.
Once proper spacing (refer to your local build-
ing code) has been established, mark your rail
and cap with a pencil where you will drill your
holes according to the diameter of your
baluster. Drill 1/2 inch deep into the cap and 1
inch deep into your handrail. This will allow you
to slide the baluster up into the handrail and
drop down into the cap.
www.houseofforgings.com