User Manual
c7000 recommendations
Table 4 Half-height server blades in c7000 device bays 1–8
• Install 3Gb SAS BL Switches in c7000 interconnect bays 3 and
4
• Attach storage enclosures for these servers to ports 1–4 of the
3Gb SAS BL Switches
If the P700m SAS controller is installed
in mezzanine slot 1:
• Install 3Gb SAS BL Switches in c7000 interconnect bays 5 and
6 or 7 and 8
• Attach storage enclosures for these servers to ports 1–4 of the
3Gb SAS BL Switches
If the P700m SAS controller is installed
in mezzanine slot 2:
nl
nl
Table 5 Half-height server blades in c7000 device bays 9–16
• Install 3Gb SAS BL Switches in c7000 interconnect bays 3 and
4
• Attach storage enclosures for these servers to ports 5–8 of the
3Gb SAS BL Switches
If the P700m SAS controller is installed
in mezzanine slot 1:
• Install 3Gb SAS BL Switches in c7000 interconnect bays 5 and
6 or 7 and 8
• Attach storage enclosures for these servers to ports 5–8 of the
3Gb SAS BL Switches
If the P700m SAS controller is installed
in mezzanine slot 2:
nl
nl
Table 6 BL2x220c server blades in c7000 device bays 1–8
• Install 3Gb SAS BL Switches in c7000 interconnect bays 5 and
6
• Attach storage enclosures for these servers to ports 1–4 of the
3Gb SAS BL Switches
“A” servers
• Install 3Gb SAS BL Switches in c7000 interconnect bays 7 and
8
• Attach storage enclosures for these servers to ports 1–4 of the
3Gb SAS BL Switches
“B” servers
nl
nl
Table 7 BL2x220c server blades in c7000 device bays 9–16
• Install 3Gb SAS BL Switches in c7000 interconnect bays 5 and
6
• Attach storage enclosures for these servers to ports 5–8 of the
3Gb SAS BL Switches
“A” servers
• Install 3Gb SAS BL Switches in c7000 interconnect bays 7 and
8
• Attach storage enclosures for these servers to ports 5–8 of the
3Gb SAS BL Switches
“B” servers
Internal mappings and cabling recommendations34