Operating System Software User Manual

3PAR InForm Management Console 4.1.0 User’s Guide
320-200231 Rev A 95
Resetting the Controller Node Battery
Test Log
To reset the controller node battery test log:
1. In the Manager Pane, click Systems.
2. In the Management Tree, click Controller Nodes under the system whose batteries
you wish to edit.
3. In the lower Controller Node Details pane displayed in Management Window, select
the Batteries tab.
4. Right-click the battery whose test log you wish to reset and click Reset Test Log.
5. Click Yes when prompted for confirmation.
Recharging Controller Node Batteries
The InForm Management Console allows you to recharge controller node batteries.
1. In the Manager Pane, click Systems.
2. In the Management Tree, click Controller Nodes under the system whose batteries
you recharge.
3. In the lower Controller Node Details pane displayed in Management Window, select
the Batteries tab.
4. Right-click the battery you wish to recharge and click Re-charge.
5. Click Yes when the battery recharge confirmation dialog box appears.
See also:
Manager Pane
Management Tree
Management Window