Reference Guide

vi
Table of Contents
3PAR InServ E-Class/F-Class Storage Server Physical Planning Manual
3.2.2 Planning for Installation 3.3
3.2.3 Preparing a Pre-Installation Site Planning Guide 3.4
3.3 Shipping and Acclimatization Requirements 3.5
3.3.1 Shipping Requirements 3.5
3.3.2 InServ Storage Server Cabinet Shipping Containers 3.6
3.3.3 Acclimatization 3.11
3.4 Administering Management Workstations 3.11
4 Structural/Environmental Considerations
4.1 Introduction 4.2
4.2 General Information 4.2
4.3 Establishing the Proper Foundation 4.3
4.3.1 Benefits of Raised Floors 4.3
4.3.2 Raised Floor Requirements 4.4
4.3.3 Weight and Pressure Loads 4.6
4.3.4 Tile Cutout Specifications 4.7
4.3.5 Anchoring Dimensions for InServ Storage Servers 4.8
4.3.6 Additional Flooring Recommendations 4.10
4.3.7 Hot-Aisle/Cold-Aisle Cooling Layout 4.11
4.4 Providing for Service Access 4.12
4.5 Meeting Environmental Conditions 4.14
4.5.1 Maintaining the Optimal Temperature 4.15
4.5.2 Air Supply and Flow 4.17
4.5.3 Air Cleanliness 4.17
4.5.4 Minimizing Vibration 4.18
5 Power Requirements
5.1 Introduction 5.2
5.2 Powering InServ Storage Servers 5.2
5.2.1 Power Distribution Units (PDUs) 5.5
5.2.2 Power Cord Connections 5.6