Brocade EZSwitchSetup Administrator's Guide - Supporting Fabric OS v5.3.0 and Brocade 200E, 3250, 4100, 4900, 5000 (53-1000441-01, June 2007)

EZSwitchSetup Administrator’s Guide 19
53-1000441-01
Connect Devices and Complete the Setup
2
The Device Connection screen provides visual feedback as you cable the switch. A green
line indicates that the connection is correct, a red line indicates an invalid connection, and
a blue line indicates a missing connection.
.
FIGURE 16 Installing Fibre Channel Cable to an SFP
3. Verify that the connections displayed on the Device Connection screen are all green.
4. Click Next.
1 Position the Fibre Channel cable 3 Brocade switch
2 Install the Fibre Channel cable
scale: 1/8" = 1"
!
I
O
IO
I
A
T
T
ENT
I
O
N:
M
axi
m
u
m
s
c
r
e
w
l
e
n
gth
f
o
r
r
a
c
k
m
o
un
t
i
n
g
t
o
b
e
5
m
mo
r1
3
/
64
i
n
.
2
1
3