Brocade EZSwitchSetup Administrator's Guide v6.2.0 (53-1001193-02, April 2009)

22 EZSwitchSetup Administrator’s Guide
53-1001193-02
Connecting devices and completing the setup
2
The Configure Ports and Connect Devices screen provides visual feedback as you cable
the switch. A green line indicates that the connection is correct, a red line indicates an
invalid connection, and a blue line indicates a missing connection.
.
FIGURE 19 Installing Fibre Channel Cable to an SFP
3. Verify that the connections displayed on the Configure Ports and Connect Devices screen are
all green.
4. Click Next.
The Finish screen is displayed.
1 Position the Fibre Channel cable 3 Brocade switch
2 Install the Fibre Channel cable
scale: 1/8" = 1"
!
I
O
I
OI
AT
T
E
N
T
ION
:
Ma
xi
m
um
s
c
r
e
w
l
e
n
gt
h
f
o
r
ra
c
k
m
o
u
n
t
i
n
g
t
o
b
e5
m
m
o
r13
/
6
4
i
n
.
2
1
3