Setting Up the Fibre Channel Switches at Both Locations
Refer to the documentation that was shipped with the switches for detailed switch
installation instructions. To set up the Fibre Channel switches at both locations:
1. Turn on the AC power for each switch.
2. Enter the IP addresses and subnet masks for each switch. Each switch must have
a different IP address.
DRM Configuration
A command line interface (CLI) must be present on both the target and initiator sites
before you begin the configuration process. Refer to the Data Replication Manager
HSG80 ACS operations guide for detailed DRM configuration instructions.
Configuring the Controllers at the Target Site
Before configuring the controllers at the target site, complete the following:
Identify the WWN on each host bus adapter and document it for later use.
Establish the name for the target site. Use a naming convention that is
meaningful, such as building or city names (for example, SiteA for the initiator
site and SiteB for the target site).
To get the DT system up and running you must first set up and configure the
controllers. To set up and configure the controllers:
1. Power off all the storage subsystems, Fibre Channel switches, Power Distribution
Units (PDUs), and the main power supply.
2. Plug all cabinet PDU power cords into the main power receptacles.
3. Apply power to the main power source.
NOTE: Be sure that there is a serial connection to each of the controllers.