HP ProLiant Cluster HA/F500 for MA8000 Enhanced DT Supplement Guide

Cluster Installation
Connecting the Initiator Site to the ATM Link
Locate the connection points linking the initiator site to the target site. To connect the
initiator site to the ATM link:
1. Connect a multimode fiber optic cable from port 6 of the first switch to
PCI number 1 on the first OSG box.
2. Connect a multimode fiber optic cable from port 6 of the second switch to
PCI number 1 on the second OSG box.
Refer to the SANworks Data Replication Manager Over an ATM Link Application
Note for information on completing the connection to the ATM link.
Creating Remote Copy Sets
Remote copy sets must be created from both the initiator and the target site.
From the Target Site
To create remote copy sets from the target:
1. Create the connections between the target and initiator sites before creating the
remote copy set by entering the following command:
ADD REMOTE RCS199 D199 InitiatorName\D199
NOTE: Although this command will fail, it creates and names the connections
appropriately.
2-34 HP ProLiant Cluster HA/F500 for MA8000 Enhanced DT Supplement Guide
HP CONFIDENTIAL
Writer: Bill Akers File Name: c-ch2 Cluster Installation
Codename: Chargers II Part Number: 324547-001 Last Saved On: 4/7/03 10:32 AM