Configuring the Host at the Target Site
Complete the following steps on the host server at the target site. The detailed steps
can be found earlier in this chapter. This procedure configures the target host with the
host bus adapters and associated drivers and software. Additional information can be
found in the ProLiant Cluster HA/F500 for MA8000 Administrator Guide.
1. “Installing the Host Bus Adapters and Drivers”
2. “Verifying StorageWorks Fibre Channel Software Installation”
3. “Installing Secure Path”
4. “Installing StorageWorks Command Console” (optional)
5. “Connecting Fiber Optic Cables Between the Hosts and Switches”
6. “Renaming the Host Connections”
Configuring the Host at the Initiator Site
Complete the following steps on the host server at the initiator site. The detailed steps
can be found earlier in this chapter. This procedure configures the initiator host with
the host bus adapters and associated drivers and software. Additional information can
be found in the ProLiant Cluster HA/F500 for MA8000 Administrator Guide.
1. “Installing the Host Bus Adapters and Drivers”
2. “Verifying StorageWorks Fibre Channel Software Installation”
3. “Installing Secure Path”
4. “Installing StorageWorks Command Console” (optional)
5. “Connecting Fiber Optic Cables Between the Hosts and Switches”
6. “Renaming the Host Connections”
7. “Enabling Access to the Host at the Initiator Site”