HP StorageWorks ESL9000 Series Pass-Through Mechanism (PTM) Installation Guide (February 2005)

Installing a PTM
54 HP StorageWorks ESL9000 Series Pass-Through Mechanism (PTM) Installation Guide
Centering the PTM assembly
After the PTM assembly has been installed in the libraries, it must be centered to
operate correctly. The procedure for centering the PTM differs depending on the
library. To center the PTM assembly in an ESL9326 library, see step 1. To center
the PTM assembly in an ESL9595 library, see step 2.
1. For the ESL9326, center the PTM between the libraries’ bin shelves as shown
in Figure 26. The distance between the bin shelves and the PTM in the left
library 1 and the distance between the bin shelves and the PTM in the right
library 2 should be equal within 0.06 inches.
Figure 26: Centering the PTM in an ESL9326 library
1
2
Bin shelves
PTM
Bin shelves