HP StorageWorks Interface Manager and Command View TL Installation Guide (March 2005)
Table Of Contents
- Title
- Contents
- About this Guide
- 1: Introduction
- 2: Hardware Installation
- Preparing the Installation
- Installing the Expansion Cage in the ESL Series Library
- Installing the Fibre Channel Interface Controllers into the Expansion Cage
- Installing the Interface Manager Card into the Expansion Cage
- Connecting the Cables
- Connecting the Interface Manager Card to the Fibre Channel Interface Controllers
- Connecting the SCSI Bus Cables
- Connecting the Fibre Channel Cables
- Connecting the Interface Manager Card to the LAN
- Connecting the PC or Laptop
- Completing the Hardware Installation
- 3: Configuration and Software Installation
- 4: Troubleshooting
- A: Serial and Ethernet Pin Assignments
- B: Regulatory Compliance Notice
- Federal Communications Commissions Notice
- Harmonics Conformance (Japan)
- German Noise Declaration
- C: Electrostatic Discharge
- D: Specifications
- Index
Hardware Installation
29Interface Manager and Command View TL Installation Guide
Installing the Cable Clamp
1. If they are not already installed, install the cable clips into each cable clamp
starting with the first position from the left edge of the clamp, as shown in
Figure 14.
Note: The library rear door may not close if clips are placed in the fourth and fifth
openings on the right edge of the cable clamp. If necessary, use the extra clips with
adhesive backing and attach them to the left side of the electronics bay frame.
Figure 14: Installing the cable clips into the cable clamp
2. Install the upper cable clamp on the expansion cage using the remaining two
top cover screws.
Figure 15: Installing the upper cable clamp