HP StorageWorks Interface Manager and Command View TL Installation Guide (March 2005)

Table Of Contents
Hardware Installation
32 Interface Manager and Command View TL Installation Guide
Installing the Fibre Channel Interface Controllers
1. Push the ejector handles so that they extend towards the outer edges of the FC
interface controller.
Figure 18: e2400-160 Interface Controller ejector handles
2. With the SCSI ports located to your left as you face the back of the library,
align the sides of the controller with the guides in the designated slot in the
expansion cage.
3. Gently push the controller into the expansion cage slot, ensuring that the
alignment pin on the controller aligns with the alignment hole in the
corresponding cage slot. Push the controller until the ejector handles engage
the metal rails on the top of the cage.