HP StorageWorks Interface Manager and Command View TL Installation Guide (March 2005)

Table Of Contents
Hardware Installation
34 Interface Manager and Command View TL Installation Guide
5. Repeat step 1 through step 4 for each controller to be installed.
6. Install 6U filler panels (slot covers) into any unused slots.
Caution: Failure to install filler panels in unused slots may result in thermal
damage to the hardware.
Figure 21: Installing filler panels in unused slots
7. Tighten the captive screws to secure the e2400-160 FC Interface Controllers
into the expansion cage.
Figure 22: Securing the interface controllers to the cage